MIKE BASIN Hotfix 01-07-2014

This hotfix handles the issue arising when a reach is subject to a minimum flow requirement at its upstream node, and at the same time seepage and/or evaporation loss are/is included in the reach, where a mass balance error is produced by this combination.

FILE INFORMATION

File nameFile size
MIKEGIS_2012_140701.zip1.2 MB

Download from US East
- If you are from North America, Latin America, Europe, the Middle East or Africa:

Download from Singapore
- If you are from the Asia-Pacific region: